• Ratnagiri Gas and Power Project Limited.

    The State Government has provided gurantee for Rs. 700 crore for the project and will provide share capital of Rs. 200 crore for L.N.G.terminal. At present the State is getting 940 mega watt of power from Dhabhol Project.


    Phase-1, Block-1
    (2 GT + 2 HRSG + 1 ST) –
    Multi Shaft Combined Cycle module

    Estimated at 2150 MW

    670 MW



    Phase-II. Block-2
    (2 GT + 2 HRSG + 1 ST) –
    Multi Shaft Combined Cycle module

    740 MW
    Phase-II. Block-3
    (2 GT + 2 HRSG + 1 ST) –
    Multi Shaft Combined Cycle module

    Regasification Terminal capacity

    Regasification Plant

    Fuel Jetty

    Breakwater
    740 MW



    5MMTPA