-
Ratnagiri Gas and Power Project Limited.
The State Government has provided gurantee for Rs. 700 crore for the project and will provide share capital of Rs. 200 crore for L.N.G.terminal. At present the State is getting 940 mega watt of power from Dhabhol Project.
Phase-1, Block-1
(2 GT + 2 HRSG + 1 ST) –
Multi Shaft Combined Cycle module
Estimated at 2150 MW
670 MW
Phase-II. Block-2
(2 GT + 2 HRSG + 1 ST) –
Multi Shaft Combined Cycle module740 MW Phase-II. Block-3
(2 GT + 2 HRSG + 1 ST) –
Multi Shaft Combined Cycle module
Regasification Terminal capacity
Regasification Plant
Fuel Jetty
Breakwater740 MW
5MMTPA
Subscribe to:
Post Comments (Atom)
0 comments: